Bathroom remodeling · Orange County
Bathrooms rebuilt right, down to the waterproofing.
Most bathroom failures happen behind the tile. We tear out to the studs, fix what we find, waterproof everything, and then make it look good. Hall baths usually take about three weeks.
What's included
One contract covers the whole job.
Every Nexa bid includes the following. You won't get separate invoices from a plumber, an electrician and a tile setter.
- Demolition to the studs
- Subfloor and framing repair
- Plumbing and venting updates
- Full shower waterproofing
- Tile floors and walls
- Vanity, fixtures and glass
- Lighting and exhaust fan
- Final clean and walkthrough
What it costs
Honest price ranges.
These are real ranges from our last two years of projects in Orange County. Your fixed price comes after the walkthrough.
| Project | Typical cost | Timeline |
|---|---|---|
| Hall bathSame footprint. New vanity, toilet, tile, tub or shower, lighting. | $18k–$32k | 2–4 weeks |
| Tub-to-showerRemove the tub, build a tiled walk-in or curbless shower with glass. | $22k–$38k | 3–4 weeks |
| Primary suiteLayout changes, double vanity, large shower, freestanding tub. | $45k–$75k+ | 5–8 weeks |
Prices include labor, materials, permits and cleanup. Appliances and designer-selected fixtures are priced separately.
Recent project · Tustin
Hall bathroom, same footprint, all new

- Timeline
- 18 working days
- Investment
- $24k–$28k
Common questions
Questions we hear at every walkthrough.
How long will we be without the bathroom?
A hall bath is typically out of service for two and a half to four weeks. If it's your only bathroom, tell us at the walkthrough and we'll sequence the work to get the toilet back in service as early as possible.
Can you convert our tub to a walk-in shower?
Yes, it's one of our most common jobs. We can build a low-curb or curbless shower, add grab bars and a bench, and make it easier to use as you get older.
What waterproofing do you use?
Every wet area gets a bonded sheet membrane with sealed seams and a flood test before any tile goes on. We photograph the membrane for your records.
Do you handle permits?
Yes. We pull the permit, schedule the inspections and close it out before final payment.
What does your warranty cover?
Our workmanship is covered for 5 years, including leaks from anything we installed. Fixtures and products also carry their manufacturers' warranties.