Six recent projects, each shot from the same spot before we started and after we finished. Drag the handle across any photo, or tap Before and After. Every project lists what we did, how long it took and what it cost.

After: open-plan kitchen in a 1950s ranch, Costa Mesa
Before: open-plan kitchen in a 1950s ranch, Costa Mesa
BeforeAfter
or drag the handle
Project 01 · Costa Mesa

Open-plan kitchen in a 1950s ranch

The old kitchen was a closed box with a sagging floor. We took the wall to the dining room down to the studs, set a new beam, and opened the whole back of the house to the yard.

Scope
Structural wall removal and beam, new subfloor, electrical and lighting, custom cabinets, quartz counters, clerestory windows
Timeline
11 weeks
Investment
$110k–$130k
Permits
City of Costa Mesa, pulled and closed by Nexa
“We were quoted eleven weeks and cooked our first dinner in week eleven.”Jenna & Chris T., Costa Mesa
Planning something like this? Get an estimate
After: hall bathroom, same footprint, all new, Tustin
Before: hall bathroom, same footprint, all new, Tustin
BeforeAfter
or drag the handle
Project 02 · Tustin

Hall bathroom, same footprint, all new

A 1970s vanity, failing tile and one overhead bulb. We kept the plumbing where it was to hold the budget and replaced everything you can see.

Scope
Vanity and medicine cabinet, porcelain tile floor, new toilet and fixtures, vanity lighting, paint
Timeline
18 working days
Investment
$24k–$28k
“Three other contractors wanted to figure it out as they went. Nexa gave us one number and stuck to it.”Harold M., Tustin
Planning something like this? Get an estimate
After: galley kitchen rebuilt from the studs, Garden Grove
Before: galley kitchen rebuilt from the studs, Garden Grove
BeforeAfter
or drag the handle
Project 03 · Garden Grove

Galley kitchen rebuilt from the studs

An earlier water leak had already taken out the cabinets. We opened the walls, replaced the damaged drywall and supply lines, and built the kitchen back with more storage than it had before.

Scope
Drywall and plumbing repair, full cabinet install, new counters, glass mosaic backsplash, range hood, original cork floor refinished
Timeline
6 weeks
Investment
$38k–$45k
“They saved the cork floor I thought we'd have to rip out.”Dana L., Garden Grove
Planning something like this? Get an estimate
After: primary bath taken down to the joists, Old Towne Orange
Before: primary bath taken down to the joists, Old Towne Orange
BeforeAfter
or drag the handle
Project 04 · Old Towne Orange

Primary bath taken down to the joists

Rot under the old tub meant the floor had to go. We sistered the joists, rebuilt the subfloor, and finished the room with a cast concrete tub and vanity.

Scope
Joist repair and new subfloor, waterproofing, cast concrete tub and vanity, wall-mount fixtures, plaster walls, clerestory lighting
Timeline
7 weeks
Investment
$52k–$60k
“Marco sent photos of the rotten joists before we signed anything. That's when we knew.”Sam & Ruth K., Old Towne Orange
Planning something like this? Get an estimate
After: kitchen refresh without moving a wall, Mission Viejo
Before: kitchen refresh without moving a wall, Mission Viejo
BeforeAfter
or drag the handle
Project 05 · Mission Viejo

Kitchen refresh without moving a wall

The layout worked. The finishes didn't. We kept every cabinet box, refinished and restained them, and changed the floor and backsplash. It took under two weeks.

Scope
Cabinet refinishing in espresso stain, new hardware, tile floor, stone backsplash, under-cabinet lighting
Timeline
12 working days
Investment
$14k–$18k
“It looks like a new kitchen for a fraction of what we were bracing for.”Priya S., Mission Viejo
Planning something like this? Get an estimate
After: 1970s staircase, modernized, Irvine
Before: 1970s staircase, modernized, Irvine
BeforeAfter
or drag the handle
Project 06 · Irvine

1970s staircase, modernized

The spindle staircase was the first thing you saw from the front door. We replaced it with open treads and a frameless glass rail, and the entry got most of its light back.

Scope
Staircase demolition, new stringers and hardwood treads, frameless glass guardrail, drywall and paint
Timeline
4 weeks
Investment
$35k–$42k
“The crew covered every floor and cleaned up every single night.”Megan R., Irvine
Planning something like this? Get an estimate

Tell us what you're planning. We'll call you back within one business hour.